Timelines, and possible city construction and/or cost-sharing. Council ultimately opted to…
Recorded in the minutes as “He detailed summaries of the amended preliminary plat, final plat, and site plan, including grading, stormwater, access, traffic study findings, trail requirements, and…”. Carried unanimously; names not recorded.
What this means (Plat): A map that divides land into lots, streets and easements.
More from the record
Recorded in the minutes as: “1. He detailed summaries of the amended preliminary plat, final plat, and site plan, including grading, stormwater, access, traffic study findings, trail requirements, and architectural design. Motion: approve a resolution to approve the amended preliminary plat for W. Bridge Road Commercial Plat 1 subject to a new trail deferral agreement”. The minutes add: “ Council discussed safety and connectivity needs, timing concerns related to the buyer of Lot 3, options for modified timelines, and possible city construction and/or cost-sharing. Council ultimately opted to approve the plat actions subject to a new trail deferral agreement …”
Motion as recorded: “approve a resolution to approve the amended preliminary plat for W. Bridge Road Commercial Plat 1 subject to a new trail deferral agreement”.
Source Full minutes for the whole Mar 23, 2026 meeting, p. 1 (saved copy) · All votes at this meeting