Waukee: Resolution awarding contract: 2026/2027 ADA Sidewalk Improvements Project
What this means: Bids and contracts. For public construction, the city approves plans and a cost estimate, takes bids, then awards the contract, usually to the lowest responsible bidder.
Waukee: Resolution approving site plan for Wal-Mart Super Center #09872-1000 [1165 E. Hickman Road],…
What this means: Site plan. A detailed drawing of how one property will be built, such as buildings, parking, driveways and landscaping. The city checks it against its rules.
Waukee: Resolution approving final plat: Fox Valley Plat 2
What this means: Plat. A map that divides land into lots, streets and easements. A preliminary plat is the proposed layout. A final plat is the official version that gets recorded with the county.
Waukee: Resolution approving final plat: Hamilton Ridge Plat 12
What this means: Plat. A map that divides land into lots, streets and easements. A preliminary plat is the proposed layout. A final plat is the official version that gets recorded with the county.
Waukee: Resolution approving final plat: Indi Run Plat 8
What this means: Plat. A map that divides land into lots, streets and easements. A preliminary plat is the proposed layout. A final plat is the official version that gets recorded with the county.
Waukee: Resolution approving site plan for Waukee MidAmerican Substation [2593 W. Hickman Road]
What this means: Site plan. A detailed drawing of how one property will be built, such as buildings, parking, driveways and landscaping. The city checks it against its rules.
Waukee: Resolution approving site plan for KeeTown Loop – R2 Building [2886 Grand Prairie Parkway]
What this means: Site plan. A detailed drawing of how one property will be built, such as buildings, parking, driveways and landscaping. The city checks it against its rules.
Waukee: Resolution approving revised final plat: Alder Point Plat 2/Alder Point Retail
What this means: Plat. A map that divides land into lots, streets and easements. A preliminary plat is the proposed layout. A final plat is the official version that gets recorded with the county.
Waukee: Resolution accepting revised site plan: Alder Point Plat 2/Alder Point Retail
What this means: Plat. A map that divides land into lots, streets and easements. A preliminary plat is the proposed layout. A final plat is the official version that gets recorded with the county.
All votes
- D. Schuett, City Attorney Steve Brick. Motion: to amend the agenda to move item F1 to follow Roll Call
- (E) Agenda Approval – Motion: to approve the agenda
What this means: Approving the agenda. A routine first vote that sets the list of items for the meeting.
- 2026/2027 ADA Sidewalk Improvements Project – A. Resolution: Consideration of approval of a resolution approving plans, specifications, form of contract and estimate of costs –…
What this means: Bids and contracts. For public construction, the city approves plans and a cost estimate, takes bids, then awards the contract, usually to the lowest responsible bidder.
- 2026/2027 ADA Sidewalk Improvements Project – B. Resolution: Consideration of approval of a resolution awarding contract – Motion: to approve the resolution
What this means: Bids and contracts. For public construction, the city approves plans and a cost estimate, takes bids, then awards the contract, usually to the lowest responsible bidder.
- Consent agenda (2 items, approved in one vote)
What this means: Consent agenda. A list of routine items the council approves together in one vote, without separate discussion. Any member can ask to pull an item out for its own vote.
- Bill list and payroll — $2,182,974.20 total (itemized list of payees in the minutes)
- Consideration of approval of City Council Minutes of 08/17/2026 Regular Meeting, 09/01/2026 Work Session a private party and File: 1. Consideration of approval of a motion…
- Ordinance: Consideration of approval of an ordinance for the division of revenues under Section 403.19, Code of Iowa, for the North Waukee Residential Urban Renewal Area (2026…
What this means: Tax increment financing (TIF). Within an urban renewal area, the extra property tax from rising values can be set aside for a period of years to pay for projects or incentives in that area, instead of going to the usual taxing bodies.
- Resolution: Consideration of approval of a resolution approving site plan for Wal-Mart Super Center #09872-1000 [1165 E. Hickman Road], tabled during the August 17, 2026, regular…
What this means: Site plan. A detailed drawing of how one property will be built, such as buildings, parking, driveways and landscaping. The city checks it against its rules.
- Fox Valley Plat 2 – A. Resolution: Consideration of approval of a resolution approving final plat – Motion: to approve the resolution
What this means: Plat. A map that divides land into lots, streets and easements. A preliminary plat is the proposed layout. A final plat is the official version that gets recorded with the county.
- Fox Valley Plat 2 – B. Resolution: Consideration of approval of a resolution accepting public improvements – Motion: to approve the resolution
What this means: Plat. A map that divides land into lots, streets and easements. A preliminary plat is the proposed layout. A final plat is the official version that gets recorded with the county.
- Hamilton Ridge Plat 12 – A. Resolution: Consideration of approval of a resolution approving final plat – Motion: to approve the resolution
What this means: Plat. A map that divides land into lots, streets and easements. A preliminary plat is the proposed layout. A final plat is the official version that gets recorded with the county.
- Hamilton Ridge Plat 12 – B. Resolution: Consideration of approval of a resolution accepting public improvements – Motion: to approve the resolution
What this means: Plat. A map that divides land into lots, streets and easements. A preliminary plat is the proposed layout. A final plat is the official version that gets recorded with the county.
- Indi Run Plat 8 – A. Resolution: Consideration of approval of a resolution approving final plat – Motion: to approve the resolution
What this means: Plat. A map that divides land into lots, streets and easements. A preliminary plat is the proposed layout. A final plat is the official version that gets recorded with the county.
- Indi Run Plat 8 – B. Resolution: Consideration of approval of a resolution accepting public improvements – Motion: to approve the resolution
What this means: Plat. A map that divides land into lots, streets and easements. A preliminary plat is the proposed layout. A final plat is the official version that gets recorded with the county.
- Resolution: Consideration of approval of a resolution approving site plan for Waukee MidAmerican Substation [2593 W. Hickman Road] – Motion: to approve the resolution
What this means: Site plan. A detailed drawing of how one property will be built, such as buildings, parking, driveways and landscaping. The city checks it against its rules.
- Resolution: Consideration of approval of a resolution approving site plan for KeeTown Loop – R2 Building [2886 Grand Prairie Parkway] – Motion: to approve the resolution
What this means: Site plan. A detailed drawing of how one property will be built, such as buildings, parking, driveways and landscaping. The city checks it against its rules.
- Alder Point Plat 2/Alder Point Retail – A. Resolution: Consideration of approval of a resolution approving revised final plat – Motion: to approve the resolution
What this means: Plat. A map that divides land into lots, streets and easements. A preliminary plat is the proposed layout. A final plat is the official version that gets recorded with the county.
- Alder Point Plat 2/Alder Point Retail – B. Resolution: Consideration of approval of a resolution accepting revised site plan – Motion: to approve the resolution
What this means: Plat. A map that divides land into lots, streets and easements. A preliminary plat is the proposed layout. A final plat is the official version that gets recorded with the county.
- Adjourn
What this means: Adjourning. The routine vote that ends the meeting.
Have your say
Agendas and minutes: city meeting portal
Contact the Waukee City Council
- Courtney ClarkeMayorcclarke@Waukee.org
- Kala AndersonCouncilkanderson@waukee.org
- Chris CroneCouncilccrone@Waukee.org
- Rob GroveCouncilrgrove@waukee.org
- Lori LyonCouncilllyonl@waukee.org
- Anna Bergman PierceCouncilapierce@waukee.org
Get email alerts
A short email when the places you follow post new decisions, with links to the official record.
Sign up