Resolution Approving a Quotation with Municipal Pipe Tool for the 2026 CIPP Sanitary Sewer…
Recorded in the minutes as “Resolution Approving a Quotation with Municipal Pipe Tool for the 2026 CIPP Sanitary Sewer Project”. Carried unanimously; names not recorded. Amount in the record: $272,010.
What this means (Resolution): A formal council decision, usually made in one vote.
More from the record
Recorded in the minutes as: “1. Resolution Approving a Quotation with Municipal Pipe Tool for the 2026 CIPP Sanitary Sewer Project. Motion: Moved by Wolling, seconded by Andorf approving a quotation with Municipal Pipe Tool for the 2026 CIPP Sanitary Sewer Project. This Quotation is for Cured In-Place Pipe (CIPP) lining of approximately 5,000 linear feet of existing 8-inch sanitary sewer lines. Through previous phases of sanitary sewer cleaning Staff has identified the areas shown on the map attached to the quote from Municipal Pipe Tool Co, LLC as needing CIPP lining. Staff wished to do a multi-phase approach addressing areas of town that would benefit from the CIPP lining most. This lining would be to maintain integrity of the sanitary sewer piping while eliminating Inflow and Infiltration (I&I) on the overall system. This project also involves the grouting of all residential laterals in the areas shown on the map. This resolution approves the Quotation with Municipal Pipe Tool for the 2026 CIPP Sanitary Sewer Project with an estimated cost not to exceed $272,010.00, per the Professional Services Agreement for CIPP Sewer Maintenance Services”.
Motion as recorded: “Moved by Wolling, seconded by Andorf approving a quotation with Municipal Pipe Tool for the 2026 CIPP Sanitary Sewer Project. This Quotation is for Cured In-Place Pipe (CIPP) lining of approximately 5,000 linear feet of existing 8-inch sanitary sewer lines. Through previous phases of sanitary sewer cleaning Staff has identified the areas shown on the map attached to the quote from Municipal Pipe Tool Co, LLC as needing CIPP lining. Staff wished to do a multi-phase approach addressing areas of town that would benefit from the CIPP lining most. This lining would be to maintain integrity of the sanitary sewer piping while eliminating Inflow and Infiltration (I&I) on the overall system. This project also involves the grouting of all residential laterals in the areas shown on the map. This resolution approves the Quotation with Municipal Pipe Tool for the 2026 CIPP Sanitary Sewer Project with an estimated cost not to exceed $272,010.00, per the Professional Services Agreement for CIPP Sewer Maintenance Services”.
Source Full minutes for the whole Jan 19, 2026 meeting (saved copy) · All votes at this meeting